Sunday, February 20, 2011

Worms

About a month ago, MAWA came to the house. Meadville Area Water Authority wanted to install a new meter in our basement that can be read from outside, eliminating the occasional necessity of being allowed in for readings. Carmen was kind of hinky about it, but let them in anyway. They installed their meter and left.

A couple of weeks later, we got a letter from MAWA in the mail. Our plumbing, it seems, is not up to snuff. They require a backflow preventer, and a shut-off before and after the meter. So I looked at the installation and ascertained that I needed a backflow preventer and a shut-off after the meter, and that it was all threaded connections I could deal with myself. So I went to The Home Depot and bought my parts, then commenced to attempt installation.

W e e e e l l l l - the valve before the meter would not shut off the water, only cut the flow in half, and to replace that would get into soldering and sweating and stuff I have no clue how to do. So I began the long process of coaxing our plumbers, who did the work on the upstairs bathroom (and still have not billed us for it) to come do the job of replacing and installing the valves. They finally returned my calls on Wednesday and showed up Thursday. They looked at the situation and ascertained that the water needed to be turned off at the street to replace the faulty valve, and while we were at it, the copper pipe leading from the basement floor entrance to the faulty valve is corroded and needs to be replaced as well. We went out to the curb and searched in vain for the shut-off valve out there.

I called MAWA and they vowed to send out a representative to shut off the water the next morning. Lo and behold, he was there bright and early. It took him about fifteen minutes to find the spot with his handy dandy metal detector. The plumbers arrived just as the MAWA guy had ascertained that the access to the valve is bent and broken and needs to be replaced before the water can be shut off. He marked the location clearly with two colors of spray paint, and vowed that it would be replaced in three days, which I took to mean Wednesday, since it was Friday at the time. The plumbers will do their work while this magic is being done, they say.

I am waiting with great anticipation to see what additional worms crawl out of this can that opened when Carmen allowed the meter replacement. It's a beautiful new meter, though.

No comments: